JOM, volume 75, issue 4, pages 1045-1058

Thorium Recovery from Choghart Mining Waste by Beneficiation Processes

Publication typeJournal Article
Publication date2023-02-13
Journal: JOM
scimago Q2
SJR0.551
CiteScore4.5
Impact factor2.1
ISSN10474838, 15431851
General Materials Science
General Engineering
Abstract
This study was carried out to develop a beneficiation process flowsheet for the recovery and separation of thorium from Choghart iron mining waste. The characterization and mineralogical studies showed that the mining waste comprised ThO2:2100 ppm, and the main thorium-containing mineral was thorite. The radiometric sorting results indicated the Choghart thorium ore has a medium sortability; furthermore, the thorium cut-off grade and thorium enrichment rate were 100 ppm and 1.2, respectively. The gravity concentration process with a wet shaking table was performed on radiometric sorting concentrate, and the optimum conditions were determined to be 1.5° deck tilt angle, 2 kg/h feed flow rate, and 6 L/min wash water flow rate, according to statistical experimental design. A final product of the wet shaking table was obtained with a ThO2 content of 1.2% and a ThO2 recovery of 90.54% in optimal conditions. The magnetic separation on the heavy and middling fractions of the shaking table in 0.2T led to concentrate production with a ThO2 grade and recovery of 10.5% and 92% and 2.15% and 89%, respectively. Finally, the combination of these separation methods in optimal conditions showed the thorium grade and recovery to be obtained at 3.1% and 74%, respectively.

Top-30

Journals

1
1

Publishers

1
1
  • We do not take into account publications without a DOI.
  • Statistics recalculated only for publications connected to researchers, organizations and labs registered on the platform.
  • Statistics recalculated weekly.

Are you a researcher?

Create a profile to get free access to personal recommendations for colleagues and new articles.
Share
Cite this
GOST | RIS | BibTex | MLA
Found error?